NEWS
2025/08/26
News
Notice on Planned Expansion of MDX II GPU Nodes (from April 2026)

From April 2026, 8 additional GPU nodes will be introduced into mdx II.
 
We are currently preparing for the start of this service.
Details such as the application period will be announced on the official website and by email as soon as preparations are complete.
 

With this addition, the existing 7 GPU nodes will be expanded by 8, bringing the total number of GPU nodes in mdx II to 15.
The system configuration of the GPU nodes after expansion is shown below.

GPU Node Configuration from April 2026

Total Computing Performance 2,104.5 TFLOPS
Node Configuration GPU node cluster
15 Nodes
<per node>
・CPU: Intel Xeon Gold 6530 Processor(2.1 GHz, 32 cores) x 2
・GPU: NVIDIA H200 SXM x 4
・Theoretical Computing Performance: 140.300 TFLOPS
・Main Memory Capacity: 1,024 GB
・Secondary Storage Capacity: 960 GB

※The theoretical performance is calculated using double precision.
※The values represent the combined performance of both CPU and GPU. The breakdown is as follows:

Theoretical Computing Performance(per node)
CPU 4.3 TFLOPS
GPU 136.0 TFLOPS