NEWS
2025/01/28
News
Announcement on the Introduction of GPU Nodes for mdx II (from Apr. 2025)

Starting from April 2025, GPU nodes will be added to mdx II.
 

We are currently preparing for the launch of this service.
Details such as the launch date, usage fees, and usage methods will be announced on the official website and via email once they are finalized.
 

Below is the system configuration of the GPU nodes to be introduced.

System Configuration

Total Computing
Performance
982.1 TFLOPS
Node Configuration GPU node cluster
7 Nodes
<per node>
・CPU: Intel Xeon Gold 6530 Processor(2.1 GHz, 32 cores) x 2
・GPU: NVIDIA H200 SXM x 4
・Theoretical Computing Performance: 140.300 TFLOPS
・Main Memory Capacity: 1,024GB
・Secondary Storage Capacity: 960GB

*The precision used to calculate the theoretical computing performance is “double precision.”

*The value of the theoretical computing performance is the sum of the performance of the CPU and GPU.

Theoretical Computing Performance(per node)
CPU 4.3 TFLOPS
GPU 136.0 TFLOPS